I am confused with the MAS Developer, Contractor, Foreman & Specialty Worker terminology, and how it all fits together to get a project completed?

Posted by:

  • DEVELOPER
  • CONTRACTOR
  • FOREMAN
  • SPECIALTY WORKER (Sub-Contractors) (such as Concrete Finisher, Excavator, etc.)

A simple way to look at it: A DEVELOPER hires a CONTRACTOR who employs one or more FOREMEN who oversee and inspect the work done by the SPECIALTY WORKERS (Sub-Contractors).

 

Continue Reading →
0

Why couldn’t the same engineering drawings be used to build multiple MAS™ structures?

Posted by:

There appears to be a complete misunderstanding of how difficult it would be to copy the MAS™ system without having access to the MAS™ engineering analytical models.

MAS™ has developed a sophisticated engineering model based around its own mathematical algorithms using finite element analysis.  MAS™ has been designed using “thin shell structural” analysis and there are just a handful of engineers in the world that understand and can operate with the advanced constraints involved with thin shell structures.

Even that handful of engineers could NOT reverse ...

Continue Reading →
0

I am a contractor and I have been asked to build MAS™ structures for a local project. Where do I start?

Posted by:

As a contractor you are familiar with building.  What you need to learn is how to fit the MAS™ system into your existing method of construction.  To start with you will need to understand how to bid the project.  This will include determining the quantity and cost of forms and the labor time and skills required.  MAS™ provides calculators to help a contractor prepare bids.  Many contractors   use these calculators initially to understand the feasibility of using the MAS™ system ...

Continue Reading →
0

Is the MAS™ system producible, i.e. if I put it out to bid to several contractors, will they know how to bid on my project?

Posted by:

YES

Producibility: A term used to describe the ability of contractors to bid on a project proposal.

Although the MAS™ system is new to many contractors, MAS™ provides a “T2” training class that is specifically designed to educate a contractor on the MAS™ system and all aspects necessary to prepare a qualified, responsive and financially viable bid.

 

Continue Reading →
0

How do you keep people from stealing the MAS™ technology and building without a License?

Posted by:

MAS™ EMPLOYS A SOPHISTICATED ELECTRONIC LICENSE VERIFICATION SYSTEM TO PREVENT THE THEFT OF THE MAS™ INTELLECTUAL PROPERTY, REGISTRATIONS, AND PATENTS (PENDING AND ISSUED).

See the following area of the MAS™ website area for more information on the MASTronic™: http://www.modernarchstructures.com/technology/mas-licensing/mastronics-embedded-rfid-license-tracking-device

MAS™ will actively pursue and prosecute, to the MAXIMUM EXTENT OF THE LAW, any violations of the MAS™ intellectual property, registrations and patents (pending and issued) throughout the world under international treaties as well as local laws, statutes, agreements, and registrations.

A ADELS Fee ...

Continue Reading →
0

If the MAS™ system is so easy to build, does it require training?

Posted by:

The reason the MAS™ system is so easy to build is because of three primary factors, one of which is training.

  1. MAS™ provides the bulk of the engineering required using its proprietary finite element analytical models.
  2. MAS™ provides a patented forming system and scaffolding system (SPiFolding)
  3. MAS™ provides the training necessary to construct the MAS™ system.
The training of workers is very important and requires very little time if such workers have a general understanding of their field of specialty.  Although the MAS™ system is incredibly easy ...
Continue Reading →
0

Does an MAS Distributor Agreement grant the holder exclusive rights?

Posted by:

MAS™ does NOT grant exclusive territories, however  MAS™ does allow the MAS Distributor to decide whether to allow one or more MAS Distributors to operate in an area if they are the holder of an MAS Distributor “A”rea certification.  So in essence this is exclusivity, but such exclusivity is granted by the MAS Distributors in the area.

There are many positive business reasons that would benefit multiple MAS Distributors to operate co-jointly in an area.  MAS™ leaves this decision up to the individual MAS Distributors.

The ...

Continue Reading →
0

How difficult is it to become a MAS Distributor?

Posted by:

This depends on the PFAD designation being requested.  The PFAD designations are listed below.  To receive an “A”rea, “F”ield, or “D”epartment MAS Distributor designation requires significantly more work than receiving a “P”roject MAS Distributor designation.  MAS Distributor “P”roject designations are routinely given by MAS™ to Contractors so they can incorporate the MAS™ system into their project.  It is rare for MAS™ to grant an MAS Distributor “P”roject designation to someone other than a Contractor.  MAS often refers to Contractors who also function as a MAS Distributor on their ...

Continue Reading →
0

Is there exclusivity with geographic regions?

Posted by:

There is NO exclusivity, however a MAS Distributor can receive a geographical region and no other MAS Distributor can operate in that region without permission from the MAS Distributor that has been given that area. In essence, this is exclusivity while allowing MAS™ to accept others if a MAS Distributor cannot provide the level of service being demanded in such area.

A “geographical area” is just one of four arenas that a MAS Distributor can receive an authorization for.  MAS™ calls this a “FAD” designation.

  • A specific ...
Continue Reading →