ACCL Kenya Project – 19 Nov 2012 MAS-570 Exterior Finish

Posted by:

The last MAS field trainer left Kenya at the end of October.  The project is going very well and the MAS-570 at the ACK church shell is done. The electrical inside the MAS- 570 is complete and the plaster on on the interior was being completed on October 30th, 2012 along with the window frames.

Remember the MAS-1300 was used as a training tool, while the MAS-570 was used as the trainees final exam and completed in record time.

Below are some photos of the exterior & interior finishing process of the MAS-570 in the final days.  This finishing process is left up to the builder and is not part of the MAS envelope.  The Kenyans have done an excellent job re-created the natural Kenya stone exterior look by stamping the exterior of the MAS-570.

You will also note that ACCL elected NOT to spray insulation onto the arch area.  Insulation was used on the corner form areas.

 