Due to the Black Cotton soil conditions, the ACCL chief engineer (Moses) elected to use a Ring Beam configuration to support an eventual “waffle” foundation pad.
20
AUG
AUG
0
Posted by: admin
Due to the Black Cotton soil conditions, the ACCL chief engineer (Moses) elected to use a Ring Beam configuration to support an eventual “waffle” foundation pad.